Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 13, 2021     40-4 Flap System step 1-4 - (8 hours) Category: Controls
Preassembled the Flap Horn to the Flap torque tube-. Match drilled 4th e flap horn #30 and then final drilled #12- Primed inside all the parts. Done for left and right flaps.
Trimmed the four F-1030 bushing according to the indication. Due to some imprecisions i decided to reorder and to redo all the bushing. Result is now acceptable,
I tried a preliminary test installation and it is very hard to position the bushing correctly....a bit of soft hammering has been necessary.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.